Annual inspection tester for cables after commissioning - Voltage
Original title: Annual inspection and testing instrument for cables after commissioning
Annual inspection and testing instrument for cables after commissioning

First test of new winding
The pilot testing equipment adopts a dedicated voltage withstand tester, and the selection of the instrument should be based on the specifications of the measured motor. The testing method, peak value, and related precautions include:
万彩网100线路The high voltage output end of the step-up transformer is connected to the tested winding, and the low voltage end is grounded. The grounding wire at the testing site must be checked regularly
The tested motor casing (or iron core) and the winding without high voltage should be reliably grounded.
万彩网100线路The test pressurization time is divided into two types: 1 minute and 1 second; For finished motor products, a 1-minute withstand voltage test shall be conducted, and the voltage value shall be in accordance with the specific provisions of GB755.
万彩网100线路After the cable is put into operation, the annual inspection and testing instrument for the semi-finished products of motor stator and winding motor rotor should be increased compared to the whole machine, as specified in the technical conditions.
万彩网100线路35kV cable frequency conversion series resonance 5km
1. Introduction
万彩网100线路ZSBX-35kV cable frequency conversion series resonance 5km
1. Assist in implementing preventive AC withstand voltage tests and handover AC withstand voltage tests for various test subjects;
2. Test the insulation ability and capacitive load of cross-linked rubber power cables, power transformers, GIS, transformers, insulators, generators, switches and other test objects to withstand various overvoltages
Communication withstand voltage test.
万彩网100线路2. Technical parameters
Test object: AC withstand voltage test of 5km 35kV/400mm2 cable, capacitance ≤ 1.073uF, test frequency 30-300Hz, test voltage 52kV, test time 60min
万彩网100线路Rated capacity: 810kVA;
Input power supply: three-phase 380V voltage, frequency 50Hz;
Rated voltage: 54kV;
Rated current: 15A;
万彩网100线路Working frequency: 30-300Hz;
万彩网100线路Device output waveform: sine wave
万彩网100线路Waveform distortion rate: Output voltage waveform distortion rate ≤ 1%;
Working time: Continuous 60 minutes allowed under rated load; Overvoltage 1.1 times for 1 minute;
Temperature rise: After continuous operation for 60 minutes under rated load, the temperature rise is ≤ 65K;
万彩网100线路Quality factor: The device itself has a Q ≥ 30 (f=45Hz);
万彩网100线路Protection function: It has overcurrent, overvoltage, and flashover protection for the test sample (see the variable frequency power supply section);
万彩网100线路Measurement accuracy: System effective value of 1.5 level;
Pilot test holding incentive transformer ZSJLB-45kVA/3kV/0.4kV 1 unit
Rated capacity: 45kVA;
万彩网100线路Input voltage: 0-400V, single-phase;
万彩网100线路Output voltage: 3kV;
Working time: 60 minutes;
Structure: Oil type;
Weight: Approximately 350kg;
万彩网100线路Size: 700 * 600 * 400
万彩网100线路Variable frequency power supply ZSXB-F-45kW/380V 1 set
Rated output capacity: 45k
万彩网100线路Working power supply: 380 ± 10% V (three-phase), power frequency
Output voltage: 0-400V, single-phase,
Rated input current: 112.5A
Rated output current: 112.5A
Voltage resolution: 0.01kV
Voltage measurement accuracy: 1.5%
万彩网100线路Frequency adjustment range: 30-300Hz
Frequency adjustment resolution: ≤ 0.1Hz
万彩网100线路Frequency stability: 0.1%
Running time: 60 minutes continuously at rated capacity
万彩网100线路Continuous operation for 60 minutes at rated capacity, component high temperature ≤ 65K;
万彩网100线路Noise level: ≤ 50dB
High voltage reactor ZSDK-405kVA/54kV, 2 sections, controlled by pilot plant
万彩网100线路Rated capacity: 405kVA;
Rated voltage: 54kV;
Rated current: 7.5A;
Inductance: 35H/single section;
万彩网100线路Quality factor: Q ≥ 30 (f=45Hz);
Working time: 60 minutes;
Structure: Oil type;
万彩网100线路Weight: Approximately 750kg;
Size: Φ 650 * 900mm
One set of ZSFR-60kV/1000pF capacitor voltage divider for pilot holding
万彩网100线路Rated voltage: 60kV;
万彩网100线路High voltage capacity: 1000pF
万彩网100线路Dielectric loss: Tg σ ≤ 0.5%;
Voltage division ratio: 1000:1
Measurement accuracy: effective value of 1.5 level;
万彩网100线路Working time: 60 minutes;
Weight: approximately 12kg;
万彩网100线路Size: Φ 160 * 850mm
Compensation capacitor voltage divider ZSFRC-60kV/10000pF 1 set
Rated voltage: 60kV;
万彩网100线路High voltage capacity: 10000pF;
Working time: 5 minutes;
万彩网100线路Weight: 12kg;
Size: Φ 150 * 600mm;
5KV (35/0.4KV) dry-type transformer
(1) Transformer parameters
万彩网100线路1. Rated capacity: 2500KVA
万彩网100线路2. Rated voltage: 35/0.4KV
3. Rated current: 41.2/3608A
万彩网100线路4. No load current%: 1.4%
万彩网100线路(2) Calculate the applied voltage
1. No load current: I=3608 × 1.4%=50.5A
2. Partial discharge test for Y, yno connection transformer
万彩网100线路Connect the winding to an ungrounded system:
万彩网100线路System high voltage: Um=40.5KV
Partial discharge test pre applied voltage: U1=1.5Um=1.5 × 40.5=61KV
Partial discharge test voltage: U2=1.1UM=1.1 × 40.5=45KV
万彩网100线路Transformer ratio: K=35/√ 3/0.4/√ 3=87.5
Apply voltage on the secondary side ao
Secondary voltage at 1.5Um voltage: U=1.5Um × 2/3 ÷ 87.5=464V
万彩网100线路Secondary voltage at 1.1Um voltage: U=1.1UM × 2/3 ÷ 87.5=342V
Transformer induction withstand voltage test:
万彩网100线路Test voltage is taken as twice the rated voltage: Us==70KV × 0.8=56KV
万彩网100线路Secondary voltage: U==56 × 2/3 ÷ 87.5==427V
3. Partial discharge test for D, yn11 wiring transformer
万彩网100线路Connect the winding to an ungrounded system:
万彩网100线路System high voltage: Um=40.5KV
万彩网100线路Partial discharge test pre applied voltage: U1=1.5Um=1.5 × 40.5=61KV
Partial discharge test voltage: U2=1.1UM=1.1 × 40.5=45KV
Transformer ratio: K=35/0.231=152
Secondary voltage at 1.5Um voltage: U=1.5Um ÷ 152=400V
Secondary voltage at 1.1Um voltage: U=1.1UM ÷ 152=290V
万彩网100线路Transformer induction withstand voltage test:
Test voltage is taken as twice the rated voltage: Us==70KV × 0.8=56KV
Secondary voltage: U==56 ÷ 152==368.4V
4. Excitation transformer capacity:
S=U×I=464×50.5=23.4KVA

1. AC voltage withstand test power supply processing
After the cable is put into operation, the annual inspection tester for high-voltage cable AC withstand voltage uses a frequency conversion resonance device to generate the test power supply. The frequency conversion cabinet is the core component of the device. The frequency conversion cabinet obtains the required frequency for the test through rectification and inversion of thyristors, and introduces a large amount of high-frequency pulse current components during the power conversion process.
The power output of the frequency conversion resonance system cannot be directly used as the power supply for cable partial discharge testing and applied directly to the test object for partial discharge testing. Effective measures must be taken to preprocess the test power supply by setting series reactance, anti corona wire, and voltage equalization ring to improve the quality of the test power supply
万彩网100线路2 Cable Terminal Partial Discharge Test Circuit
The partial discharge test circuit of the cable terminal, when partial discharge occurs inside the tested cable, the coupling capacitor instantly charges the cable terminal, forming a high-frequency pulse charging current waveform. The amplitude and frequency of the pulse current reflect the severity of the partial discharge inside the cable. The two sensors of channel 1 and channel 2 transmit the partial discharge signal to the partial discharge diagnosis system for analysis and processing.
At the middle joint of the cable, as shown in the testing principle, there is a capacitance Ca between the armor of one side of the cable and the cable conductor, and a capacitance Cb between the conductor and the armor of the other side of the cable. If partial discharge occurs at the middle joint of the cable, two capacitors C1 and C2 are formed. At this time, Ca and Cb will charge and discharge to C1 and C2 through the conductor, forming a partial discharge current circuit. A high-frequency and low resistance capacitor arm C0 and a high-frequency current sensor are bridged in the shielding layer of both sides of the cable to detect the pulse current signal of partial discharge
: